Notice: unserialize(): Error at offset 536448 of 556959 bytes in /home/dmafloor/public_html/libraries/src/Cache/CacheController.php on line 182
DMA Floors - Dr Springman DDS Lobby

Considerations for Operating / Procedure Rooms

ECCC-Exam-Room
  • What level (if any) of ESD-electro static discharge does the space require? (there are ESD options with Vinyl and Resinous)
  • Does the space require a seamless tie in between the floor, cove, and wall?
  • Will there be any floor drains, trenching, or sub floor access and have you considered how to tie those in?