Considerations for Operating / Procedure Rooms
- What level (if any) of ESD-electro static discharge does the space require? (there are ESD options with Vinyl and Resinous)
- Does the space require a seamless tie in between the floor, cove, and wall?
- Will there be any floor drains, trenching, or sub floor access and have you considered how to tie those in?